Joining Critical Path Training as an Instructor

No Comments

It is now official. I have joined Critical Path Training as an instructor. Critical Path Training (formerly known as Ted Pattison Group) is a widely renowned leader in the SharePoint training space. I’m honored to be part of the team and looking forward to working together and bringing world class SharePoint 2010 training to the market.

I’m currently working on the course Creating No-Code SharePoint Designer Solutions for SharePoint 2010 which will cover SharePoint Designer, InfoPath and SharePoint Workspace. We’ll start offering this class in early 2010 in both the instructor led and hands on format and online.

VN:F [1.8.8_1072]
Rating: 0.0/5 (0 votes cast)
  • Share/Bookmark

Leave a Reply